10.4.16. Removal and installation of differentials
|  | In total самоконтрящиеся bolts and nuts are subject to replacement without fail!  | 
   Forward differential  
 
 Details of installation of forward differential 
|  | 
| 
| 
 Details of installation of forward differential are shown on an illustration to which all references which are found in the text belong.   Remove forward wheels.    Turn out the corresponding stopper and merge oil from differential.   Otboltite the forward driveshaft from a connecting flange of the leading gear wheel, - tie up a shaft to a frame.    By means of a stripper release both top spherical support from the corresponding cross levers of a suspension bracket, check a condition of boots, estimate degree of wear of support, in case of need make replacement.    Remove panels of finishing of a motive compartment.   Release from differential both a power shaft, - try not to damage guards.   Disconnect a ventilating hose from a differential case.    Turn out fixing bolts (14a) and remove assembly of forward differential (14).    Installation is made upside-down.    In conclusion check differential for existence of signs of development of leaks.  |  | 
Back differential  
 
 Details of installation of back differential 
|  | 
| 
| 
 To detail of installation of back differential it is presented on an illustration to which all references which are found in the text belong.    Remove power shafts (37).    Turn out fixing bolts and disconnect the driveshaft (106) from a connecting flange of the leading gear wheel of back differential (50), - tie up a shaft to a car frame.   Release a ventilating hose (55) from clamps on the fuel tank, - except the models equipped with the additional fuel tank (ML 55 AMG) on which the hose can be released only after lowering of differential.   Uncover (50d) fixing bolts.    On models ML 55 AMG remove the guard (1s) established on the left side from assembly of differential.   Prop up assembly of back differential (50).   Remove elements of a suspension bracket of fastening of back differential to the holder (A/V) Bridge.   Turn out fixing bolts (50a), omit assembly of differential (50) down and take it from under the car, - on models ML 55 AMG do not forget to release after lowering of assembly of differential from clamps on the fuel tank a ventilating hose.    Estimate a condition of forward and back rubber support in the holder of the back bridge, in case of need make their replacement.    Installation is made upside-down.    In conclusion check differential for existence of signs of development of leaks.  |  |