4.4.10. Removal and installation of a final collector
Details of installation of a final collector of the engine of a series 111
|
- Details of installation of a final collector of the engine of a series 111 are shown on an illustration to which all references which are found in the text belong.
- Remove a lambda probe.
- Turn out fixing nuts and remove a final collector.
- Remove sealing laying of a final collector (156/3).
- Remove a basic arm of a final collector.
|
Location of a basic arm of a final collector of the engine of a series 111 |
- Check a condition of fixing nuts, in case of need make replacement.
- Carefully smooth out the interfaced surfaces of a collector and the block of cylinders.
- Installation is made upside-down, - temporary fixing of NEW sealing laying can be provided by means of several dabs of sealant.
|
|
M112/113
|
- Details of installation of final collectors of engines of series 112 and 113 are shown on illustrations to which all references which are found in the text belong.
|
Details of installation of the left final collector of the engine of a series 112 and 113 |
|
Details of installation of the right final collector of the engine of a series 112 and 113 |
- Remove forward wheels.
- Remove loker and deflectors of protection of wheel arches.
- Turn out bolts (11/1) of fastening to a final collector of a reception pipe of system of production of the fulfilled gases.
- Release fixture of fixing of a reception pipe to a basic arm on a transmission case.
- Give fixing nuts (156/1) and remove a final collector (156).
|
Nuts of fastening of final collectors are subject to replacement without fail! |
- Carefully smooth out the interfaced surfaces of a collector and the block of cylinders.
- Installation is made upside-down, - do not forget to replace sealing laying (156/5).
|
|