5.2.14. Removal of a casing of the K/V evaporator
Details of installation of a casing of the K/V evaporator
Details of installation of a casing of the K/V evaporator
|
|
All sealing elements are subject to replacement without fail. |
- Details of installation of a casing of the evaporator of the conditioner of the air/heat exchanger of a heater are shown on illustrations to which all references which are found in the text belong.
- Empty the cooling system (see the Head of the Power supply system and production of the fulfilled gases).
- Disconnect an overflow hose of the cooling system from a board of the rechargeable battery.
- Release fixing a collar and disconnect the top hose from the electric water pump.
- Give fixing nuts and remove a broad tank of the cooling system from a partition of a motive compartment. Take a tank aside.
- Disconnect hoses of a cooling path (17) from the heater heat exchanger.
- In the conditions of a workshop of car service make the К/В system discharge.
- Give самоконтрящуюся a nut (16) of the broad valve (15).
- Disconnect from the broad valve (15) low pressure (13) and high-pressure (14) lines of a refrigerator path.
- Remove the holder of the dashboard (4).
- Release the module of management of ETC (N15/3) from clamps.
- Disconnect an electrical wiring from an electric motor of the drive of the mixing gate of air (M16/8).
- Disconnect an electrical wiring from a step electric motor of the drive of the gate of switching of the modes of air circulation (M39).
- Disunite the contact socket of an electrical wiring (B10/6x1) of the sensor of temperature of the evaporator.
- Disconnect an electrical wiring from resistive assembly of the fan of a heater (6).
- Disconnect an electrical wiring from the fan of a heater (5).
- Remove the module of management of K/B (N19).
- Release from intermediate clamps on a casing of the evaporator (1) a cable plait.
- Remove the sound-proof panel (2).
- Disconnect a drainage hose from the lower part of a casing of the K/B (1) evaporator.
- Remove a casing (1).
- Installation is made upside-down, - gas station of the air conditioning system has to be made in the conditions of a workshop of car service.
- In conclusion check the cooling system for existence of signs of development of leaks.
|
|